Today (11/30/18) was the start of the actual work on the table. Today was spent with the 4 inch angle grinder cutting the angle Iron to the size of the 2 ft by 4 ft base. This was then drilled for the rivets and held in place by bolts till all work is done. The sides were also drilled for the hooks that will hold the table to the frame. With the poor job I did on cutting the edges, i might need to plan on forging corners. I still want to have gaps to allow water to drain, but i also want it to be aesthetically pleasing.